GPU models: 8Providers: 5Price points: 73Gulf regions: Dubai · Abu Dhabi · Doha · BahrainUpdated: 19 Nov 2026, 02:15 UTC
Gulf GPU Index / AI clusters

Largest AI supercomputers in the Gulf

What is actually running, ranked by measured speed, and the gigawatt projects still being built, ranked by planned power. Every number links to its source. Checked 17 Nov 2026.

Fastest AI system runningShaheen III (GPU)122.8 PFlop/s · KAUST · world #25
Largest project being builtDataVolt Oxagon AI campus1,500 MW planned · First 100 MW in 2028
GPU systems on the TOP50011UAE 6 · Saudi Arabia 5 · Qatar, Kuwait, Bahrain, Oman 0
Gigawatt sites running today0Every 1 GW+ project is still being built

Running today

Ranked by Rmax: the speed each system measured on the TOP500 benchmark (TOP500, November 2026), in PFlop/s.

  1. 1Shaheen III (GPU)KAUST122.8PFlop/s · world #25
    NVIDIA GH2002,800 GPUsSaudi ArabiaTOP500 · KAUST, Nov 2025
  2. 2SuperPOD (DGX H100)Core42 (G42)55.8PFlop/s · world #51
    NVIDIA H100UAETOP500
  3. 3AI-03Core42 (G42)54.1PFlop/s · world #52
    AMD MI210UAETOP500
  4. 4EYASTahakom48.8PFlop/s · world #57
    NVIDIA H200Saudi ArabiaTOP500
  5. 5Dammam-7Saudi Aramco22.4PFlop/s · world #102
    NVIDIA V100Saudi ArabiaTOP500
  6. 6TII-Oryx-HPCTechnology Innovation Institute19.5PFlop/s · world #115
    NVIDIA H100UAETOP500
Show 5 more
  1. 7MBZUAI B200 clusterMBZUAI13.2PFlop/s · world #163
    NVIDIA B200UAETOP500
  2. 8Tuwaiq-1Saudi Aramco8.5PFlop/s · world #228
    NVIDIA H100Saudi ArabiaTOP500
  3. 9Artemis (DGX-2)G427.3PFlop/s · world #258
    NVIDIA V100UAETOP500
  4. 10Dhabi SupercomputerTechnology Innovation Institute5.1PFlop/s · world #323
    NVIDIA A100UAETOP500
  5. 11Unaizah-4Saudi Aramco4.4PFlop/s · world #345
    NVIDIA H100Saudi ArabiaTOP500
#SystemSpeed, PFlop/sWorld rankChipGPUsCountrySource
1Shaheen III (GPU)KAUST122.8#25NVIDIA GH2002,800Saudi ArabiaTOP500 · KAUST, Nov 2025
2SuperPOD (DGX H100)Core42 (G42)55.8#51NVIDIA H100not publishedUAETOP500
3AI-03Core42 (G42)54.1#52AMD MI210not publishedUAETOP500
4EYASTahakom48.8#57NVIDIA H200not publishedSaudi ArabiaTOP500
5Dammam-7Saudi Aramco22.4#102NVIDIA V100not publishedSaudi ArabiaTOP500
6TII-Oryx-HPCTechnology Innovation Institute19.5#115NVIDIA H100not publishedUAETOP500
7MBZUAI B200 clusterMBZUAI13.2#163NVIDIA B200not publishedUAETOP500
8Tuwaiq-1Saudi Aramco8.5#228NVIDIA H100not publishedSaudi ArabiaTOP500
9Artemis (DGX-2)G427.3#258NVIDIA V100not publishedUAETOP500
10Dhabi SupercomputerTechnology Innovation Institute5.1#323NVIDIA A100not publishedUAETOP500
11Unaizah-4Saudi Aramco4.4#345NVIDIA H100not publishedSaudi ArabiaTOP500

Running, but not benchmarked

Commercial and sovereign clusters rarely submit to the TOP500, so their speed is unknown. Listed with what the operator has published.

ClusterSizeChipCountryNoteSource
Microsoft cloud capacity in the UAEMicrosoft with G4221,500 A100-equivalentsA100, H100, H200UAEMicrosoft reports A100-equivalent units, not physical GPUs.Reuters via The Star, Nov 2025
Groq inference clusterGroq with Aramco Digital19,000 LPUsGroq LPU (not a GPU)Saudi ArabiaInference chips; not comparable with GPU counts.Middle East AI News, Feb 2025
HUMAIN AMD clusterHUMAIN with AMD and CiscoNot disclosedAMD MI355XSaudi ArabiaLive since Sep 2026; next phase of 250 MW from 2027.TelecomTV, Sep 2026
Ooredoo sovereign AI data centreOoredoo KuwaitNot disclosedNVIDIA H200KuwaitLaunched Nov 2025.Middle East AI News, Nov 2025

Being built and announced

Ranked by planned power in megawatts. total planned first phase

  1. 1DataVolt Oxagon AI campusDataVolt with HUMAIN1,500 MWfirst 100 MW
    BuildingSaudi ArabiaFirst 100 MW in 2028
    Details and sources

    Chip not disclosed. Ground broken Aug 2026. Phase 1 is 360 MW.

  2. 2Stargate UAEG42, OpenAI, Oracle1,000 MWfirst 200 MW
    BuildingUAEFirst 200 MW expected end of 2026
    Details and sources

    NVIDIA GB300. Part of the 5 GW UAE–US AI Campus. First phase was targeted for Q3 2026.

  3. 3HUMAIN × AMDHUMAIN, AMD, Cisco1,000 MWfirst 250 MW
    AnnouncedSaudi Arabia250 MW from 2027, 1 GW by 2030
    Details and sources

    AMD MI400 series. Earlier plan (Nov 2025) was 100 MW in 2026.

  4. 4HUMAIN × NVIDIAHUMAIN (PIF)500 MWfirst 84 MW
    AnnouncedSaudi ArabiaOver 5 years; 14 MW B300 from Q4 2026, 70 MW Rubin from mid-2027
    Details and sources

    NVIDIA GB300, B300, Rubin. First phase announced as 18,000 GB300. Not confirmed installed.

  5. 5xAI × HUMAINxAI with HUMAIN500 MWplanned
    AnnouncedSaudi ArabiaNo date given
    Details and sources

    NVIDIA GB300. May overlap with HUMAIN × NVIDIA; do not add the two.

Show 5 more
  1. 6Oman AI campusMubbadrah, Sustopia, Vela Tech400 MWplanned
    AnnouncedOmanNo date given
    Details and sources

    Chip not disclosed. $3bn plan; up to 400 MW.

  2. 7Microsoft × G42 expansionMicrosoft, G42, Khazna200 MWplanned
    BuildingUAEFirst capacity before end of 2026
    Details and sources

    NVIDIA GB300. On top of existing Microsoft capacity in the UAE.

  3. 8HUMAIN Riyadh and DammamHUMAIN200 MWplanned
    BuildingSaudi ArabiaGo-live was targeted for Q2 2026
    Details and sources

    Chip not disclosed. No public go-live notice found.

  4. 9HUMAIN × QualcommHUMAIN with Qualcomm200 MWplanned
    AnnouncedSaudi ArabiaFrom 2026
    Details and sources

    Qualcomm AI200/AI250. Inference racks, not GPUs.

  5. 10AWS × HUMAIN AI ZoneAWS with HUMAIN50 MWplanned
    AnnouncedSaudi ArabiaUp to 50 MW by 2028
    Details and sources

    NVIDIA GB300, AWS Trainium. 2025 headline was up to 150,000 accelerators.

#ProjectPlanned power, MWStatusCountryFirst capacityNote and source
1DataVolt Oxagon AI campusDataVolt with HUMAIN1,500first phase 100 MWBuildingSaudi ArabiaFirst 100 MW in 2028Ground broken Aug 2026. Phase 1 is 360 MW.
Middle East AI News, Aug 2026
2Stargate UAEG42, OpenAI, Oracle · NVIDIA GB3001,000first phase 200 MWBuildingUAEFirst 200 MW expected end of 2026Part of the 5 GW UAE–US AI Campus. First phase was targeted for Q3 2026.
OpenAI, May 2025 · The National, Dec 2025
3HUMAIN × AMDHUMAIN, AMD, Cisco · AMD MI400 series1,000first phase 250 MWAnnouncedSaudi Arabia250 MW from 2027, 1 GW by 2030Earlier plan (Nov 2025) was 100 MW in 2026.
AMD, Nov 2025 · TelecomTV, Sep 2026
4HUMAIN × NVIDIAHUMAIN (PIF) · NVIDIA GB300, B300, Rubin500first phase 84 MWAnnouncedSaudi ArabiaOver 5 years; 14 MW B300 from Q4 2026, 70 MW Rubin from mid-2027First phase announced as 18,000 GB300. Not confirmed installed.
NVIDIA, May 2025 · The National, Oct 2026
5xAI × HUMAINxAI with HUMAIN · NVIDIA GB300500AnnouncedSaudi ArabiaNo date givenMay overlap with HUMAIN × NVIDIA; do not add the two.
W.Media, Nov 2025
6Oman AI campusMubbadrah, Sustopia, Vela Tech400AnnouncedOmanNo date given$3bn plan; up to 400 MW.
Middle East AI News, Oct 2026
7Microsoft × G42 expansionMicrosoft, G42, Khazna · NVIDIA GB300200BuildingUAEFirst capacity before end of 2026On top of existing Microsoft capacity in the UAE.
Tech Informed, Nov 2025
8HUMAIN Riyadh and DammamHUMAIN200BuildingSaudi ArabiaGo-live was targeted for Q2 2026No public go-live notice found.
Bloomberg, Aug 2025
9HUMAIN × QualcommHUMAIN with Qualcomm · Qualcomm AI200/AI250200AnnouncedSaudi ArabiaFrom 2026Inference racks, not GPUs.
The National, Oct 2025
10AWS × HUMAIN AI ZoneAWS with HUMAIN · NVIDIA GB300, AWS Trainium50AnnouncedSaudi ArabiaUp to 50 MW by 20282025 headline was up to 150,000 accelerators.
Middle East AI News, Sep 2026

Not in the table: the UAE–US AI Campus (5,000 MW), because it is the umbrella that contains Stargate UAE. The National, Dec 2025. Projects without a power figure (SDAIA's 5,000 Blackwell GPUs, Qai's cluster at MEEZA in Qatar) are left out until one is published.

Why two lists: a system that is running and a plan on paper are not the same thing. Mixing them would put a 2030 target above a computer that works today.

Questions

What is the largest AI supercomputer in the Middle East?

By measured performance, Shaheen III (GPU) at KAUST in Saudi Arabia. It ran the TOP500 benchmark at 122.8 PFlop/s, world #25 on the TOP500, November 2026 list, with 2,800 NVIDIA GH200 chips. Commercial clouds such as Microsoft's UAE capacity are larger in total but are not benchmarked publicly.

What is the largest AI data centre being built in the UAE?

Stargate UAE in Abu Dhabi, built by G42 with OpenAI and Oracle. It is planned at 1,000 MW, with the first 200 MW expected at the end of 2026. It sits inside the 5,000 MW UAE–US AI Campus.

How many GPUs does HUMAIN in Saudi Arabia have?

HUMAIN announced a first phase of 18,000 NVIDIA GB300 in May 2025 and an AMD MI355X cluster went live in September 2026. Neither installed count has been published, so we do not list one.

Can companies rent GPUs in the Gulf today?

Yes. Azure, AWS and Oracle list GPU instances in Dubai, Abu Dhabi, Doha and Bahrain, and Core42 in Abu Dhabi publishes from-prices; the Gulf GPU Index price table compares them. Reserved clusters for months are arranged through brokers and neoclouds.

Method