Largest AI supercomputers in the Gulf
What is actually running, ranked by measured speed, and the gigawatt projects still being built, ranked by planned power. Every number links to its source. Checked 17 Nov 2026.
- 1Shaheen III (GPU)KAUST122.8PFlop/s · world #25
- 2SuperPOD (DGX H100)Core42 (G42)55.8PFlop/s · world #51
- 3AI-03Core42 (G42)54.1PFlop/s · world #52
- 4EYASTahakom48.8PFlop/s · world #57
- 5Dammam-7Saudi Aramco22.4PFlop/s · world #102
- 6TII-Oryx-HPCTechnology Innovation Institute19.5PFlop/s · world #115
Show 5 more
- 7MBZUAI B200 clusterMBZUAI13.2PFlop/s · world #163
- 8Tuwaiq-1Saudi Aramco8.5PFlop/s · world #228
- 9Artemis (DGX-2)G427.3PFlop/s · world #258
- 10Dhabi SupercomputerTechnology Innovation Institute5.1PFlop/s · world #323
- 11Unaizah-4Saudi Aramco4.4PFlop/s · world #345
| # | System | Speed, PFlop/s | World rank | Chip | GPUs | Country | Source |
|---|---|---|---|---|---|---|---|
| 1 | Shaheen III (GPU)KAUST | 122.8 | #25 | NVIDIA GH200 | 2,800 | Saudi Arabia | TOP500 · KAUST, Nov 2025 |
| 2 | SuperPOD (DGX H100)Core42 (G42) | 55.8 | #51 | NVIDIA H100 | not published | UAE | TOP500 |
| 3 | AI-03Core42 (G42) | 54.1 | #52 | AMD MI210 | not published | UAE | TOP500 |
| 4 | EYASTahakom | 48.8 | #57 | NVIDIA H200 | not published | Saudi Arabia | TOP500 |
| 5 | Dammam-7Saudi Aramco | 22.4 | #102 | NVIDIA V100 | not published | Saudi Arabia | TOP500 |
| 6 | TII-Oryx-HPCTechnology Innovation Institute | 19.5 | #115 | NVIDIA H100 | not published | UAE | TOP500 |
| 7 | MBZUAI B200 clusterMBZUAI | 13.2 | #163 | NVIDIA B200 | not published | UAE | TOP500 |
| 8 | Tuwaiq-1Saudi Aramco | 8.5 | #228 | NVIDIA H100 | not published | Saudi Arabia | TOP500 |
| 9 | Artemis (DGX-2)G42 | 7.3 | #258 | NVIDIA V100 | not published | UAE | TOP500 |
| 10 | Dhabi SupercomputerTechnology Innovation Institute | 5.1 | #323 | NVIDIA A100 | not published | UAE | TOP500 |
| 11 | Unaizah-4Saudi Aramco | 4.4 | #345 | NVIDIA H100 | not published | Saudi Arabia | TOP500 |
- Microsoft cloud capacity in the UAEMicrosoft with G4221,500 A100-equivalentsA100, H100, H200UAE
Microsoft reports A100-equivalent units, not physical GPUs.
- Groq inference clusterGroq with Aramco Digital19,000 LPUsGroq LPU (not a GPU)Saudi Arabia
Inference chips; not comparable with GPU counts.
- HUMAIN AMD clusterHUMAIN with AMD and CiscoNot disclosedAMD MI355XSaudi Arabia
Live since Sep 2026; next phase of 250 MW from 2027.
- Ooredoo sovereign AI data centreOoredoo KuwaitNot disclosedNVIDIA H200Kuwait
Launched Nov 2025.
| Cluster | Size | Chip | Country | Note | Source |
|---|---|---|---|---|---|
| Microsoft cloud capacity in the UAEMicrosoft with G42 | 21,500 A100-equivalents | A100, H100, H200 | UAE | Microsoft reports A100-equivalent units, not physical GPUs. | Reuters via The Star, Nov 2025 |
| Groq inference clusterGroq with Aramco Digital | 19,000 LPUs | Groq LPU (not a GPU) | Saudi Arabia | Inference chips; not comparable with GPU counts. | Middle East AI News, Feb 2025 |
| HUMAIN AMD clusterHUMAIN with AMD and Cisco | Not disclosed | AMD MI355X | Saudi Arabia | Live since Sep 2026; next phase of 250 MW from 2027. | TelecomTV, Sep 2026 |
| Ooredoo sovereign AI data centreOoredoo Kuwait | Not disclosed | NVIDIA H200 | Kuwait | Launched Nov 2025. | Middle East AI News, Nov 2025 |
- 1DataVolt Oxagon AI campusDataVolt with HUMAIN1,500 MWfirst 100 MWBuildingSaudi ArabiaFirst 100 MW in 2028
Details and sources
Chip not disclosed. Ground broken Aug 2026. Phase 1 is 360 MW.
- 2Stargate UAEG42, OpenAI, Oracle1,000 MWfirst 200 MWBuildingUAEFirst 200 MW expected end of 2026
Details and sources
NVIDIA GB300. Part of the 5 GW UAE–US AI Campus. First phase was targeted for Q3 2026.
- 3HUMAIN × AMDHUMAIN, AMD, Cisco1,000 MWfirst 250 MWAnnouncedSaudi Arabia250 MW from 2027, 1 GW by 2030
Details and sources
AMD MI400 series. Earlier plan (Nov 2025) was 100 MW in 2026.
- 4HUMAIN × NVIDIAHUMAIN (PIF)500 MWfirst 84 MWAnnouncedSaudi ArabiaOver 5 years; 14 MW B300 from Q4 2026, 70 MW Rubin from mid-2027
Details and sources
NVIDIA GB300, B300, Rubin. First phase announced as 18,000 GB300. Not confirmed installed.
- 5xAI × HUMAINxAI with HUMAIN500 MWplannedAnnouncedSaudi ArabiaNo date given
Details and sources
NVIDIA GB300. May overlap with HUMAIN × NVIDIA; do not add the two.
Show 5 more
- 6Oman AI campusMubbadrah, Sustopia, Vela Tech400 MWplannedAnnouncedOmanNo date given
- 7Microsoft × G42 expansionMicrosoft, G42, Khazna200 MWplannedBuildingUAEFirst capacity before end of 2026
Details and sources
NVIDIA GB300. On top of existing Microsoft capacity in the UAE.
- 8HUMAIN Riyadh and DammamHUMAIN200 MWplannedBuildingSaudi ArabiaGo-live was targeted for Q2 2026
- 9HUMAIN × QualcommHUMAIN with Qualcomm200 MWplannedAnnouncedSaudi ArabiaFrom 2026
- 10AWS × HUMAIN AI ZoneAWS with HUMAIN50 MWplannedAnnouncedSaudi ArabiaUp to 50 MW by 2028
Details and sources
NVIDIA GB300, AWS Trainium. 2025 headline was up to 150,000 accelerators.
| # | Project | Planned power, MW | Status | Country | First capacity | Note and source |
|---|---|---|---|---|---|---|
| 1 | DataVolt Oxagon AI campusDataVolt with HUMAIN | 1,500first phase 100 MW | Building | Saudi Arabia | First 100 MW in 2028 | Ground broken Aug 2026. Phase 1 is 360 MW. Middle East AI News, Aug 2026 |
| 2 | Stargate UAEG42, OpenAI, Oracle · NVIDIA GB300 | 1,000first phase 200 MW | Building | UAE | First 200 MW expected end of 2026 | Part of the 5 GW UAE–US AI Campus. First phase was targeted for Q3 2026. OpenAI, May 2025 · The National, Dec 2025 |
| 3 | HUMAIN × AMDHUMAIN, AMD, Cisco · AMD MI400 series | 1,000first phase 250 MW | Announced | Saudi Arabia | 250 MW from 2027, 1 GW by 2030 | Earlier plan (Nov 2025) was 100 MW in 2026. AMD, Nov 2025 · TelecomTV, Sep 2026 |
| 4 | HUMAIN × NVIDIAHUMAIN (PIF) · NVIDIA GB300, B300, Rubin | 500first phase 84 MW | Announced | Saudi Arabia | Over 5 years; 14 MW B300 from Q4 2026, 70 MW Rubin from mid-2027 | First phase announced as 18,000 GB300. Not confirmed installed. NVIDIA, May 2025 · The National, Oct 2026 |
| 5 | xAI × HUMAINxAI with HUMAIN · NVIDIA GB300 | 500 | Announced | Saudi Arabia | No date given | May overlap with HUMAIN × NVIDIA; do not add the two. W.Media, Nov 2025 |
| 6 | Oman AI campusMubbadrah, Sustopia, Vela Tech | 400 | Announced | Oman | No date given | $3bn plan; up to 400 MW. Middle East AI News, Oct 2026 |
| 7 | Microsoft × G42 expansionMicrosoft, G42, Khazna · NVIDIA GB300 | 200 | Building | UAE | First capacity before end of 2026 | On top of existing Microsoft capacity in the UAE. Tech Informed, Nov 2025 |
| 8 | HUMAIN Riyadh and DammamHUMAIN | 200 | Building | Saudi Arabia | Go-live was targeted for Q2 2026 | No public go-live notice found. Bloomberg, Aug 2025 |
| 9 | HUMAIN × QualcommHUMAIN with Qualcomm · Qualcomm AI200/AI250 | 200 | Announced | Saudi Arabia | From 2026 | Inference racks, not GPUs. The National, Oct 2025 |
| 10 | AWS × HUMAIN AI ZoneAWS with HUMAIN · NVIDIA GB300, AWS Trainium | 50 | Announced | Saudi Arabia | Up to 50 MW by 2028 | 2025 headline was up to 150,000 accelerators. Middle East AI News, Sep 2026 |
Not in the table: the UAE–US AI Campus (5,000 MW), because it is the umbrella that contains Stargate UAE. The National, Dec 2025. Projects without a power figure (SDAIA's 5,000 Blackwell GPUs, Qai's cluster at MEEZA in Qatar) are left out until one is published.
Why two lists: a system that is running and a plan on paper are not the same thing. Mixing them would put a 2030 target above a computer that works today.
What is the largest AI supercomputer in the Middle East?
By measured performance, Shaheen III (GPU) at KAUST in Saudi Arabia. It ran the TOP500 benchmark at 122.8 PFlop/s, world #25 on the TOP500, November 2026 list, with 2,800 NVIDIA GH200 chips. Commercial clouds such as Microsoft's UAE capacity are larger in total but are not benchmarked publicly.
What is the largest AI data centre being built in the UAE?
Stargate UAE in Abu Dhabi, built by G42 with OpenAI and Oracle. It is planned at 1,000 MW, with the first 200 MW expected at the end of 2026. It sits inside the 5,000 MW UAE–US AI Campus.
How many GPUs does HUMAIN in Saudi Arabia have?
HUMAIN announced a first phase of 18,000 NVIDIA GB300 in May 2025 and an AMD MI355X cluster went live in September 2026. Neither installed count has been published, so we do not list one.
Can companies rent GPUs in the Gulf today?
Yes. Azure, AWS and Oracle list GPU instances in Dubai, Abu Dhabi, Doha and Bahrain, and Core42 in Abu Dhabi publishes from-prices; the Gulf GPU Index price table compares them. Reserved clusters for months are arranged through brokers and neoclouds.
Method
- Running today comes from the TOP500, November 2026 list: every system in the Gulf with GPUs or other accelerators. CPU-only systems are left out.
- Status is "Building" when construction has started publicly, "Announced" when only a plan or agreement is public.
- Megawatts are the operator's planned figure. Where plans changed, we show the latest and note the earlier one.
- Corrections: each row links to its source. Send a better source and we update the row.